BIM Coordination at Prince of Wales Hospital
NCCC & AATC – Stage 2
Services provided on the Prince of Wales Hospital NCCC & AATC Stage 2 Project
Mechanical contractor appointment. LOD350.
Commissioned to manage the services coordination process between all trades 3D models and deliver a site reviewed as built model with minimum data attributes added. Coordination review of the design model, architectural and structural as well as the contractors was provided. Production of a project BIM outline report was produced and provided to the various project teams. Mechanical services modelling and shop drawings were also provided.